What a Difference a Hole Makes...the Evolution of the Darwin Zone,
Henty, Tasmania
1989 to 1991
Drill-out on
Zone 96 and the Sill Zone; 506,000 tonnes at 26.9 g/t for 440,000oz.
1991 to 1994 35.3% JV partner
unable to raise finance for development; exploration halted; equity converted
to 10% NSR royalty; JV dissolved
June 1994 Exploration
recommences.
July 1994 to June 1995 4 holes drilled at Mount Julia; in hindsight, these holes were
drilled just over the top of the Mount Julia and Darwin Zone orebodies.
September 1995 MJ005;
Mount Julia discovery hole; 43m grading 2.4g/t Au
Sept 1995 to Sept 1997 Drill-out on Mount Julia; Inferred
Resource of 760,000tonnes at 7.6g/t for
180,000oz gold; marginal grades, but contains zones of higher grade; still open
north and south.
1997
Down-plunge extension of Zone 96
reassessed and tested;
July 1997 MJ015; Zone 15 discovery hole; 7m at 14g/t Au
October
1997 MJ018; Tyndall Zone discovery hole;
4m at 5g/t Au
September
1998 MJ020; Darwin Zone discovery hole; 32m at
7g/t Au
September 1998 Decision on exploration decline to
Zone 15; future assessment of Mount Julia to be from underground
March 1999 Positive results
from Zone 15 drilling lead to go-ahead for exploration decline to Mount Julia
June
1999 Zone 15;
112,000 tonnes at 15.3g/t for 64,000oz
gold.
June
2000 Tyndall
Zone; 180,000 tonnes at 8g/t for 46,000oz gold.
December 2000 Positive results from Mount Julia
drilling lead to go-ahead for exploration decline to Darwin Zone
June 2002 Darwin Zone Reserve; 1,063,000 tonnes
grading 10.3g/t for 352,000oz gold. Mount Julia Reserve; 198,600 tonnes at 8.5g/t for 54,200oz gold.
Looking back on the exploration history at Henty, there have been
a number of critical events that have influenced key decision points. During
the last seven years of exploration, a large mineralised system was outlined, 1
to 2km south of the original Henty Mine. Because of the high capital cost and
commercial risk involved in accessing and evaluating this resource, it took a
considerable period of time before a commitment was made to the project.
Some of the more critical factors in the discovery were:
·
continuity of staff involved in the project which ensured that
knowledge was retained,
·
very sound geological understanding that was built up from the
exploration and mining of Zone 96 and the Sill Zone and then extrapolated to
the rest of the system.
However,
at a time when the options were being critically evaluated, it was the result
from one hole that tipped the balance: MJ020;
Darwin Zone discovery hole; 32m at 7g/t gold.